Yet Another Bulletin Board
Sponsored by: The Fans!


Welcome, Guest. Please Login or Register.
Apr 18th, 2024, 10:34pm

Upcoming Premiere Dates:
Survivor 23, Season premiere
Thursday, September 14 (8:00-9:30 PM, ET/PT) on CBS




Home Home Help Help Search Search Members Members Chat Chat Member Map Member Map Login Login Register Register

| Fantasy Survivor Game | Music Forums | The '80s Server Forums | Shop Online |



Metropolis Reality Forums « paid attention to in the construction of kiln »

   Metropolis Reality Forums
   Amazing Race
   Fantasy Amazing Race Games
(Moderators: JP, Heather, Isle_be_back)
   paid attention to in the construction of kiln
Previous topic | New Topic | Next topic »
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print
   Author  Topic: paid attention to in the construction of kiln  (Read 162 times)
qizhen0926
Guest

Email

paid attention to in the construction of kiln
« on: Feb 7th, 2018, 2:04am »
Quote Quote Modify Modify Remove Remove

Because the quality of the construction is of great significance in the value of the kiln, it is necessary to pay attention to the construction of the kiln. Kiln construction has certain requirements for construction and technical personnel, because even the design document is perfect, but do not know the kiln characteristics, or can not do the work, just to have the experience of refractory brickwork is not enough, also must seriously study the construction method and its procedures, and strictly implement. Construction is a serious and meticulous technical work. The sense of responsibility and technological level of the construction staff is the key to the success of construction. Construction is a creative and painstaking labor process combining theory with practice. The constructors are good at organizing the allocation, diligently checking and supervising, dealing with problems and making decisions in a timely manner, etc., which is conducive to better operation of technical level and dynamism of operators, so that the quality can reach the upper limit of the acceptance specification as far as possible, so as to get excellent construction quality. Construction personnel must firmly establish a long-term goal, the concept of quality first, careful construction, under the premise of ensuring quality and reduce the cost of trying to speed up the progress of.
1, first of all, the builders should fully understand the design intent, grasp the physical and chemical performance indicators of materials, check the quality and size of materials, and timely study the countermeasures according to the specific circumstances.Vacuum PVD Metallized Silver Coater
2, the construction personnel must make detailed technical disclosure to the workers before carrying out every process. In the process of masonry, we should check the quality of construction and the size and location of control drawings at any time.Vacuum Sintering Furnace Sintering Furnace Price Nabertherm Furnace
3, considering that datum and centerline are standard for kiln construction, they are standard for checking and measuring at any time during the progress of kiln construction. Therefore, we must strictly and accurately lay out datum and centerline, and fasten them firmly.
4. The laying of the track in the tunnel kiln is very important, and it is the key part that affects the quality of the construction. So in the process of laying in the various types of comrades should closely cooperate, work must be strict in demands, track after repeated measurement several times after approval is fixed.
Factory Sale Custom Alloy Vacuum Brazing Furnace
IP Logged
Back to top
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print

Previous topic | New Topic | Next topic »

Metropolis Reality Forums » Powered by YaBB 1 Gold - SP 1.3.1!
YaBB © 2000-2003. All Rights Reserved.