Copper Huang Expressway planning stage
« on: Sep 5th, 2016, 1:47am » |
Quote Modify
|
Build neat standard site project department focus on site pre-construction planning, unified layout in accordance with the "overall layout, complete functions, to meet the standard, intensive and efficient" concept, in accordance with the present station construction industrialized, mechanized, intensive design. In order to effectively ensure the quality of the project, they focus on the full range of concrete using mixing, transported by special transport vehicles to the place of use, the construction of a unified standard steel processing field, carried out on the steel factory, automated processing. On a temporary resident manager of facilities, construction of access roads, mixing stations, and other precast yard in accordance with the main project implementation program, the first design drawings, executed after the trial, and then follow the construction drawings and specifications, according to the same quality control procedures for inspection. Through this management, project construction temporary facilities and reasonable layout, both to meet the needs of construction management and production, but also to tidy up the specification results. Construction site of humanization, reflected in the work of all staff, housing, and other aspects of human caring. Road Maintenance Machinery Suppliers tarmac laying equipment durable asphalt sealcoating calculator single drum compactor
|