Yet Another Bulletin Board
Sponsored by: The Fans!


Welcome, Guest. Please Login or Register.
Sep 24th, 2025, 3:39am

Upcoming Premiere Dates:
Survivor 23, Season premiere
Thursday, September 14 (8:00-9:30 PM, ET/PT) on CBS




Home Home Help Help Search Search Members Members Chat Chat Member Map Member Map Login Login Register Register

| Fantasy Survivor Game | Music Forums | The '80s Server Forums | Shop Online |



Metropolis Reality Forums « Copper Huang Expressway planning stage »

   Metropolis Reality Forums
   Survivor
   Survivor General Gossip & News
(Moderators: lakelady, yesteach, MediaScribe, Isle_be_back)
   Copper Huang Expressway planning stage
Previous topic | New Topic | Next topic »
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print
   Author  Topic: Copper Huang Expressway planning stage  (Read 153 times)
zhangxiaosan
ForumsNet Member
Antigua 
*



I love YaBB 1G - SP1!

   
View Profile

Posts: 2
Copper Huang Expressway planning stage
« on: Sep 5th, 2016, 1:47am »
Quote Quote Modify Modify


 
Build neat standard site project department focus on site pre-construction planning, unified layout in accordance with the "overall layout, complete functions, to meet the standard, intensive and efficient" concept, in accordance with the present station construction industrialized, mechanized, intensive design.
 
In order to effectively ensure the quality of the project, they focus on the full range of concrete using mixing, transported by special transport vehicles to the place of use, the construction of a unified standard steel processing field, carried out on the steel factory, automated processing.
 
On a temporary resident manager of facilities, construction of access roads, mixing stations, and other precast yard in accordance with the main project implementation program, the first design drawings, executed after the trial, and then follow the construction drawings and specifications, according to the same quality control procedures for inspection.
 
Through this management, project construction temporary facilities and reasonable layout, both to meet the needs of construction management and production, but also to tidy up the specification results. Construction site of humanization, reflected in the work of all staff, housing, and other aspects of human caring.
 
Road Maintenance Machinery Suppliers
tarmac laying equipment durable
asphalt sealcoating calculator
single drum compactor
IP Logged
Back to top
Pages: 1  Reply Reply Add Poll Add Poll Notify of replies Notify of replies Send Topic Send Topic Print Print

Previous topic | New Topic | Next topic »

Metropolis Reality Forums » Powered by YaBB 1 Gold - SP 1.3.1!
YaBB © 2000-2003. All Rights Reserved.